In apply 100 5 before getting burner careful before debugging about lighting those who enrage burner examine:
One, examine light gas to whether reach the designated position, light the whether clean unobstructed of tracheal road, valve whether already open.
2, from sky of platoon of deflate of the conduit before a powerful person burning gas, do not have mixture air in order to make sure pipeline is medium, discharge empty canal to should be received together piece outdoor.
3, have divulge a phenomenon without pipeline, pipeline facilities is reasonable.
About 100 interior of 5 careful burner burning gas examine burner:
One, the combustion head of combustion machine whether equipment and had adjusted.
2, external whether does circuit connection accord with a requirement.
3, basis circuitry state undertakes cold conditions imitate to combustion machine, it is normal whether each components of the equipment in investigating the work reach blaze exploration to protect a share normally.
4, the way that electric machinery rotates is right.
About 100 get burner of 5 careful burner burning gas debug:
One, examine external light gas to whether reach the designated position, pipeline whether unobstructed, exterior power source is held accuse to reach the designated position.
2, move the load of combustion machine to small negative charge, combustion azimuth is moved to small negative charge accordingly, close to big negative charge undertakes burning and investigate blaze condition, basis blaze state is motor to servo or air door
About 100 5 careful machine burning gas debug burner is as careful as what repair item:
One, when machine of combustion burning gas produces combustion process 2 times to suffer a defeat one after another, should stop machine examine, the air feed system of combustion machine is regular, circuit connects a line correct, prevent breakdown rear can start combustion chance afresh.
2, already aerated when air feed pipeline, and the demand when group of a powerful person is amiss ravels, principal be necessary to cut off total a powerful person of front of group of a powerful person, next to group of a powerful person to total a powerful person the gas in this paragraph of conduit undertakes putting empty, talent has group of a powerful person later ravel with repair.
3, check in air feed a powerful person the place such as group or conduit flange face smokes, solder, the violate the rules and regulations such as cut works.
4, whether is there fuel in checking air feed pipeline, with aeriform low pressure normally the watch is checked can.
5, in air feed pipeline, it is to had had platoon air, but tube wall has rudimental gas or droplet, if encounter electrostatic scintilla and guild of bright fire photograph,cause combustion to reach blow up.
6, check apply in the spot without explosion proof electric and dynamoelectric tool.
7, air feed pipeline checks with spanner or metallic marvellous knock, conflict, avoid to cause electrostatic or scintilla, cause light gas to blow up.
8, equipment of VPS504 leak hunting is necessary to examine group of a powerful person to cover a head before apply.
9, check undertake beside pipeline and group of a powerful person and pressure regulator valve any bright fire are checked, avoid grave accident happening.
10, burn in debugging the job, what are the 100 careful item that get burner? Light gas to be necessary to accomplish attentive, safe, efficient.
Copyright © 2019.Company name All rights reserved.More Templates Ultra-low emissions - Collect from Ultra low emissions burner